The limits we plan inside include: openings that are confirmed, not forecast; the skills a job actually requires; the courses and credentials that build those skills, and how long they take; class and cohort schedules; the places involved and the distance between them; who is available, and when; and the capacity of the rooms, labs, machines and people everything depends on. A plan earns the name only when it satisfies all of them at once.
That sounds obvious. It is not how most plans are made. Most plans start from an average, a target, or last year’s pattern, and discover the real limits later — one collision at a time, usually after commitments have been made on the strength of them.
This is also the method behind our flagship project: a data pipeline we are building — Michigan data in; insights and recommendations out, for employers and programs, and for the Michigan economy as a whole. Its first public outputs are already live — Axiovex Signals, our daily board; The Axiovex Signal, our monthly newsletter; and the monthly Michigan Workforce Intelligence report — and every recommendation the pipeline produces is built this way: from the real limits, all at once. Axiovex works both sides of that: consultants and researchers today, and the builders and future managers of the program the research adds up to: Axiovex Arcturus, a workforce and capability program for participating employers, universities, and workforce organizations. Its planning system uses a projected constraint system — the method on this page, carried into the program’s operations and fed by the pipeline. Bringing clarity, and building a program that turns that clarity into workable plans, is what the company is for.
A worked example — illustrative
One cohort of welders
Say an employer needs welders starting in June, and the credential takes a full term. A plan built on the average would enroll a cohort in January and hope. A constraint-based plan checks the real limits: the course sequence and its actual length, the lab’s stations, the instructor’s hours, the start date that cannot move, and each participant’s work schedule and drive.
If the cohort would finish in July, the conflict shows up now — and the plan changes while changing is cheap: an earlier start, a split cohort, or a second start date the employer agrees to. And if none of those work — if the time simply is not there — the method says so, and names time as the binding constraint, instead of letting June arrive with no welders.